Check out our new Shopping Cart! It's Secure and Faster and Easier than ever to find what you need!

We're having an amazing sale on our Railstrongs! Click for more details

Titan Wood Post Anchor

The Most Advanced Wood Post Anchor system available.

See our brochure.

What Can We Do To Make Your Visit Better?

Real projects being built and details of construction?

More reviews of new products and accessories?

Online design tools or calculators?

More resources to find builders in your area?

Please tell us what else we can do for you


Coolest Deck Contest

2010 Coolest Backyard Deck Contest is now open!

See the 2009 winners

See the 2008 winners



Calculators
Use a concrete calculator and mix your own cement or call in the truck

Use our concrete calculator, Angle and Unit conversion calculators. Learn more...

The Innovators Podcast Interviews
The Innovators Podcast Interviews

Richard speaks with some of the leading minds in the building products industry.

Testimonials - Titan Post Anchor

"Great product, I don't know how I would have done what I wanted to do on the deck any better. It works great, very sturdy. Thanks!"

Tullos T. - North Little Rock, Arkansas

More...

Get the Free Rockler Catalog
Coolest Backyard Deck Contest

See the 2009 winners!

See the 2008 winners

Deck Building - Footing, Pier and Beam Placement

Your editor of Ideas-For-Deck-Designs.com

In deck building footing and pier placement is crucial to the entire building process.

A deck requires certain minimum strength properties and so it’s essential to have enough support posts to keep the deck from collapsing or sinking into the soil.

But excavating for footings and piers and pouring concrete is one of the most labor intensive parts of the deck building process.

Footing

A footing is simply a wider concrete base spread out beyond the walls of the pier in order to distribute the weight of the pier over a larger area.

This prevents the piers from sinking into the soil over time and also prevents the pier from heaving during thaw cycles. The effectiveness of the footing against heaving depends upon whether it is deeper than the frost line.

Pier

The pier is the vertical support usually formed by a tube and should protrude above the grade at least 4 inches. Eight inch piers are usually more than sufficient for most deck building projects.

Draw the Deck Shape on Paper

Draw out the shape of your deck on some graph paper to get a visual image of its size and proportions. Start from the point of view of trying to use the least supporting posts possible so that labor and materials can be minimized.

There are some very helpful tables for beam spans between posts that can assist you as you layout your deck plan on paper.

Remember that joists must always run parallel to beams.

In our example we ran one beam across the front of the deck and then ran another beam 90 degrees directly back to the house to support a cantilevered section of the deck. This design required only two footings and piers for the front beam and only one footing for the last support post near the house.

Locate the Hole Positions

Triangulate to locate holesUse triangulation and the hypotenuse formula to help you layout accurate locations for the holes that you will dig. Use our angle calculator.

In this case we used the triangulation to accurately mark the corners of the finished deck and then measured in the appropriate distances to pin point the center of each hole.

Pythagoras Theory

Remember your high school geometry class? If not here’s a quick refresher:

x² + y² = z²


Triangulate for the next holeOn a right-angled triangle use the two known sides (x and y). In our case x will be 8 feet out from the house and y will be 6 feet along the house.

The hypotenuse is the diagonal and unknown. By calculating the hypotenuse distance we guarantee that the angle out from the house is perpendicular.

But to calculate the value of z we take the square root of the total sum of the squares of x and y (64 +36 =100).

z=v100

Locating the exact position of the holeThe square root of 100 is 10. So create your triangle with 8, 6 and 10 foot segments. That’s exactly what we did here to pinpoint the outside corners of our deck.

We measured out 8 feet – across the house 6 feet and knew that the hypotenuse had to be 10 feet. We did this for both pier locations on the front beam.

The location of the pier for the second beam was simply measured 18” from the house foundation. And we located the front pier positions by measuring 18” off of the front edge of the deck and 12” off the side edge of the deck.

Beams

The beams for this deck were two laminated 2x8 red cedar timbers cut so that the front beam extended beyond the side of the deck. It would be cut to final size once the deck frame was finished.

The second beam was overlapped and securely nailed to the first beam. The corner joint was to sit directly on the 4x4 deck support post.

Once the positions of the piers and beam locations have been determined with a high degree of accuracy, its time to start digging.

Go to Digging the Footings and Piers or back to Deck Building Project.