Deck Building - Digging the Holes for the Footings and Piers

Your editor of Ideas-For-Deck-Designs.com

Digging holes is labor intensive. It’s as simple as that. And in our example, the landscapers had already laid down the fabric and stone so the digging had to be done after the fact.

Check For Any Underground Services

This is the first thing you must do. Be certain that you are not going to cut a hydro line or any other services.

Tarp around hole to keep area cleanTo keep the site clean, we laid out a tarp and dumped the entire back fill on to it during the digging phase.

This made it much easier to clean up when the back fill when back into the hole around the pier. Then we just spread the stone back over small amount of soil around the pier.

Proper Footings

If you want to build your deck right and ensure that the deck will not settle over time and to prevent any heaving from freeze and thaw cycles, you should incorporate a footing below your pier.

This means you must build an area at the bottom of the hole that is wider than the diameter of the pier. This spreads out the weight of the deck structure. It can also prevent heaving if you dig the hole deep enough.

Tips For Better Footings

Dig the bottom of the hole wider than the opening. Think of creating a cavity in the ground similar to an upside down mushroom. The concrete will fill the void and act like a footing and the shape will make it harder to heave.

Create a makeshift from out of 2x4 scraps and fill it with concrete before you pour the piers.

Dig the hole wide enough from top to bottom and use a pre-formed footing. Then you can pour the footing and the pier in one step. This is an excellent method. Learn more about this method.

Setting The Post Anchors Into The Cement

4x4 metal post bracket set into concreteWhile the cement is still wet, set whatever style of post anchor you are going to use into the cement at the center of the pier and hopefully in line with where you envision the beam to run.

This should be done as accurately as possible.

Sonotube before pouring cementIn our example we used a post anchor that required drilling a pin hole into the hardened concrete and then attaching the bracket to the protruding bolt.

OK, now that your footings and piers are poured you can move to the next phase of the deck building process – Attaching the Ledger Board to the house or back to Deck Building Project.

Top of Deck Building Digging

Titan Wood Post Anchor

The Most Advanced Wood Post Anchor system available. Learn more... And see our brochure.

The Coolest Backyard Deck Contest. Win $500.
Paw Brand Decking Materials and Products
Exotic decking materials and fine building products. Make your deck last a lifetime. Learn more...

Deck Foundations and Fence Post Holes Solutions

No Concrete, No Mess, No Fuss. Best in its Class. Learn more...
Enter Zip Code:
Search within miles

Calculators

Use a concrete calculator and mix your own cement or call in the truckUse our concrete calculator for volumes of cement for deck footings or our angle and unit conversion calculators. Learn more...


Testimonials - Titan Post Anchor System

Titan post anchor from testimonial"Thanks again Richard for FedExing the other shipment of the Titan Anchors. They are installed, sturdy and look great. I am really happy with them here is a picture of the deck."
Kyle D. - Richardson, Texas

Home Depot Deals

homedepot.ca
Great Savings at the Homedepot.ca Rebate Centre!
$2.95/Month for Design Software - I'm Not Kidding!



Useful Tools


Get the Free Rockler Catalog

Outdoor Patio Furniture

Plow & Hearth

Other Backyard Ideas
Backyard Design Software

Garden and Landscape Design Software for the Novice or Professional. Turn your Yard into the Dream You've Always Wanted

Five Simple Home Improvement Projects


Learn More...

How Are We Doing?
Good Site? Vote at:
Starting Point Directory
Directory